Possession and build-out

Ready to move in. Built out your way.

Both buildings are complete and units are ready for immediate occupancy. Each unit is a roughed-in shell: finish it yourself, or have the Foundry team build it out for you.

Updated November 2026

What comes with a unit

Height
19.5 ft clear under a 22 ft building.
Power
3-phase, 120/208 or 600/347 volt, with a data conduit.
Heat and ventilation
100,000 BTU unit heater on thermostat control. Roof-mounted 12 by 12 inch air inlet interlocked with a 200 CFM extraction fan.
Plumbing and water
Toilet and lavatory rough-ins. One-inch underground water line and sleeves stubbed in.
Lighting
150 W LED high bay lighting inside. Security and perimeter lighting outside.
Storefront
Your choice of a 16 by 12 ft fixed glass front or a 12 by 12 ft glass overhead door.

Second floors and mezzanines

A walled-in second floor can cover up to 75% of your unit's floor area. An open mezzanine with a railing can cover up to 25%. The Fig built an open mezzanine with a lounge, drafting tables and room to teach. See what they built.

Who does the build-out

You can finish the space yourself, or the Foundry team can do the build-out for you. Forge Development keeps a preferred contractor list to make the move from shell to open seamless.

Approvals

Every business needs a development permit from the Town of Okotoks, a business licence and approval from the condo board. See which uses are allowed.

Documents on request

Site, floor and condominium plans, the condo bylaws and budget, environmental and geotechnical reports, the appraisal and permits. Ask Dustin for any of them.